Knowledge Hub

Learn Industrial Engineering the practical way

Free articles, Excel templates and calculators on IE, Excel and the garments industry - written from real factory experience.

🔒 Some lessons and files are for members.Create accountMember login
Lean & Six Sigma🔒 Members

Hoshin Kanri, the X-Matrix and Human Value Stream Mapping

Align yearly company goals with department projects using the X-Matrix, and align people with work using Human Value Stream Mapping, a skill matrix and a Kaizen suggestion system.

2 min read · 08 Oct 2026
Merchandising🔒 Members

Garment costing step by step: building an FOB price

Fabric, trims, CM from SAM and cost per minute, washing/printing, commercial costs and margin - a worked T-shirt example and the common costing mistakes.

2 min read · 08 Oct 2026
Lean & Six Sigma🔒 Members

Value stream mapping, Kanban and pull systems from sample to bulk

Draw the current and future state of your sample-to-bulk flow, see lead time vs value-added time, and use Kanban cards and a pull system between cutting, sewing and finishing to cut WIP.

2 min read · 08 Oct 2026
Merchandising

The garment merchandiser: role, skills and the export order flow

What a merchandiser does from enquiry to payment, the ten steps of an export order, the documents at each step, and the habits of a good merchandiser.

3 min read · 08 Oct 2026
Lean & Six Sigma🔒 Members

TPM for sewing and cutting: the 8 pillars, OEE, MTTR and MTBF

Total Productive Maintenance for garment machines: the 8 pillars, autonomous maintenance by operators, and how to calculate OEE, MTTR and MTBF with a worked sewing-line example.

2 min read · 08 Oct 2026
Utility

Water, ETP and fire safety systems: what every manager should know

The steps of effluent treatment, the main parts of a factory fire system, which extinguisher to use on which fire, and the checks buyers and inspectors look for.

3 min read · 08 Oct 2026
Lean & Six Sigma🔒 Members

Six Sigma for garment factories: DMAIC, DPMO and sigma level

What Six Sigma means, DMAIC vs DMADV, the main tools, and a worked example that turns 500 defective garments out of 50,000 into DPMO and a sigma level - with the conversion table.

2 min read · 08 Oct 2026
Utility

Electrical power in a garment factory and how to save energy

Grid, substation, generator and distribution in a single-line view, power factor, load balancing, and the energy savings that pay back fastest - servo motors and LED lights.

3 min read · 08 Oct 2026
Lean & Six Sigma🔒 Members

Process mapping: SIPOC, swim lane and VA / NVA / delay analysis

Map any garment process - sample approval, size set or cutting - with SIPOC for the big picture, a swim lane for who does what, and activity analysis to measure how much time really adds value.

2 min read · 08 Oct 2026
Downloads

Templates & guides

Excel, PDF and Word files, ready to use. Files marked 🔒 are for members.

XLSX
Operation Bulletin Template 🔒 Members
Automatic Bottle Neck And Operation Wise Efficiency Measure.
🔒 Log in

Get one practical IE tip every week

Join IE and production professionals learning with in2eff.