Industrial Engineering
SAM, time study, GSD, line balancing, efficiency and more - the core of IE in garment factories.
What is SAM (SMV) and how to calculate it
Standard Allowed Minute is the base of every target, efficiency and cost in a garment factory. Here is how it is built, step by step.
Absenteeism in Garments — Causes, Impact and Reduction
Absenteeism is a major hidden cost in garment factories and can be reduced with the right system.
Time Study in Garments — Step by Step Beginner Guide
Time study is the scientific method to measure how long an operation should take.
Takt Time in Garments — How to Calculate and Use
Takt time is the pace of customer demand. It aligns production speed with real demand.
Standard Minute Value (SMV) — Complete Beginner Guide
SMV is the cornerstone of industrial engineering in garments. Learn what it is and how to calculate it.
Skill Matrix in Garments — Complete Guide
A skill matrix shows the skill level of each operator on each operation and guides training.
Production Target per Hour — How to Set Correctly
Setting the right hourly target is critical for line performance and operator motivation.
Productivity — How to Calculate and Improve in Garments
Productivity measures output per unit of input and drives factory profitability.
Operator Utilization — How to Measure and Improve
Operator utilization measures how much of the paid time an operator is actively working.