Knowledge Hub / Free tools

Free IE calculators

Quick answers for everyday industrial engineering work. Everything is calculated in your browser - nothing is saved or sent.

Target & efficiency

Plan a line's target, or check the efficiency it achieved.

Available minutesMP × hours × 60–
Target per hour–
Target per dayAvailable min × eff% ÷ SAM–
Actual efficiencyOutput × SAM ÷ available min–

Line balancing

One operation per line: name, SMV, operators. Paste from Excel with commas or tabs.

Total SMV / operators–
Pitch time (ideal)Total SMV ÷ operators–
BottleneckHighest SMV ÷ operators–
Output per hour at bottleneck–
Balance efficiencyPitch time ÷ bottleneck time–

Man machine ratio (MMR)

Total employees for every running machine - a key cost indicator.

Total employees–
Man machine ratioTotal employees ÷ running machines–
Direct ratio(Operators + helpers) ÷ machines–
Helpers per operator–

Machine requirement

How many machines of one type a style needs to hit its target.

Minutes needed per hourSMV × target–
Exact machinesSMV × target ÷ (60 × eff%)–
Machines to plan (rounded up)–

Time study

Observed cycle times with rating and allowance, as in a capacity study.

Average observed time–
Normal timeObserved × rating%–
Standard timeNormal × (1 + allowance%)–
Capacity per hour60 ÷ standard time–
Efficiency vs SAMSAM ÷ standard time–

These tools give quick estimates. Read the Knowledge Hub for how each formula works.

Get one practical IE tip every week

Join IE and production professionals learning with in2eff.