Time study step by step: rating and allowance

How to run a capacity study on the sewing floor that gives numbers you can trust.

2 min read · Updated 16 Sep 2026 · By Md. Saiful Islam

A time study measures how long an operator takes to complete an operation. In garment factories it is often called a capacity study, because the result tells you how many pieces an operator can make per hour.

Before you start

  • Explain to the operator what you are doing and why. People work more naturally when they are not worried.
  • Make sure the method is correct and the machine is set up properly.
  • Agree the start and end point of the cycle, for example "pick up the part" to "place the finished part on the bundle".

Step 1 - Break the operation into elements

Short elements are easier to time and help you see waste later:

  1. Pick up and align parts
  2. Sew
  3. Trim and dispose

Step 2 - Time at least 10 cycles

Record each cycle. Remove cycles with obvious interruptions (thread break, talking, missing parts), but write down why - those delays are real and belong in the allowance or NPT records.

Step 3 - Rate the performance

Rating compares the operator's pace with a normal pace of 100%. A skilled, fast operator may be rated 110-120%; a slow learner 80-90%.

Tip: Rate the pace, not the person. Watch hand speed, confidence and smoothness of motion.

Step 4 - Add allowances

Allowances cover time the operator needs but that is not part of the cycle:

AllowanceTypical range
Personal needs5%
Fatigue4-6%
Machine & bundle delays3-6%

Many factories use one combined figure of 10-20%.

Step 5 - Calculate

Formula: Normal time = Average observed time × Rating ÷ 100. Standard time = Normal time × (1 + Allowance ÷ 100). Capacity per hour = 60 ÷ Standard time (minutes).

Example: average 30 s, rating 100%, allowance 10% → normal time 0.50 min, standard time 0.55 min, capacity 109 pieces per hour. If the bulletin SAM is 0.50 min, the operator's efficiency is 0.50 ÷ 0.55 = 90.9%.

Use the result

  • Put operators where their capacity fits the line's target.
  • Find operators who need training.
  • Update the capacity after training or a method change.

Try the numbers in our free time study calculator.

Get one practical IE tip every week

Join IE and production professionals learning with in2eff.