Final inspection does not check every garment - it checks a random sample and decides for the whole lot. AQL (Acceptable Quality Limit) sets how many defects the sample may have before the lot is rejected.

AQL sampling table, General level II
AQL sampling table, General level II

The four inputs

  1. Lot size - the number of pieces offered for inspection (the PO or shipment quantity).
  2. Inspection level - usually General level II for garments.
  3. AQL value per defect type - commonly 0 for critical, 2.5 for major, 4.0 for minor (buyer manuals differ).
  4. Plan - single sampling, normal inspection.

Reading the table

  • Find the lot size → read the code letter (General II).
  • The code letter gives the sample size.
  • At the chosen AQL, read Ac (accept if defects ≤ Ac) and Re (reject if defects ≥ Re).
Lot sizeCodeSampleAQL 2.5 Ac/ReAQL 4.0 Ac/Re
151-280G322 / 33 / 4
281-500H503 / 45 / 6
501-1,200J805 / 67 / 8
1,201-3,200K1257 / 810 / 11
3,201-10,000L20010 / 1114 / 15
10,001-35,000M31514 / 1521 / 22

Worked example

Lot of 2,000 pieces, AQL 2.5 major / 4.0 minor:

  • Code K, sample 125 pieces.
  • Major: accept up to 7, reject at 8.
  • Minor: accept up to 10, reject at 11.
  • Critical (for example a needle piece, sharp object, wrong safety label): any one = reject.

The inspector finds 6 major and 12 minor defects → majors pass, but minors fail (12 ≥ 11) → lot rejected. Each defect type is judged separately.

Doing it fairly

  • Carton selection: usually the square root of the number of cartons, drawn at random from different parts of the stack.
  • Pull pieces from different cartons, sizes and colours.
  • Also do carton and packing checks, measurement checks on some pieces, and any function tests (zippers, snaps, pull test) the buyer requires.
  • Count defective units by defect type following the buyer's defect list.

Note: AQL 2.5 does not mean "2.5% defects are fine" in every lot. It is the quality level the plan accepts most of the time. Aim for zero - and pass pre-final at a tighter level than the buyer uses.

Key points

  • Lot size + General II → code letter → sample size.
  • Compare defects found with Ac/Re for each defect type.
  • Critical defects: zero tolerance.